Publish Time: 2026-10-08 Origin: Site
A deposit split is three structures, not one slogan: thirty then seventy, half and half, or full prepay for a new buyer. Ask when the money is taken, not only that a deposit exists.
Percentage and timing are separate levers. A 30 percent then 70 percent split taken before anyone buys or makes the goods locks cash for the whole sourcing window; the same split taken only before shipment locks cash for a shorter stretch. A 50 percent and 50 percent split and a full prepay for a new buyer change how much goes out first, yet both still need the same timing question. Ask which split sits on the confirmation, and whether that prepay lands before buying or only before the carton leaves. A line that merely says a deposit is required answers neither question, so unread timing stays a pause until the file states it.
MILDTRANS does not fill any of the three percentages. The house is a China buying-and-shipping desk, not a factory, and no deposit percentage is written on its file. The 30 percent then 70 percent split, the 50 percent and 50 percent split, and full prepay for a new buyer are not this desk's terms. Whether any prepay would fall before buying or only before shipment stays unread. Payment is telegraphic transfer — T/T, a bank wire — through HSBC. A letter of credit — LC — is refused at MILDTRANS. That refusal is a payment-channel line, not a deposit ratio.
Regular-category minimum order quantity — MOQ — is five. A trial is two. Those figures are lot sizes, not a prepay ratio. Regular outbound is 7–15 days. Same-day departure is not the standing clock. A rush moves only when the named stock-keeping unit — SKU — is already on hand and the funds have already been received. That funds line is a rush condition. It is not a 30 percent deposit and it is not a 50 percent deposit.
Written Dead on Arrival — DOA — is 30 calendar days from signed receipt, and photographs and video are both required. The 30 in that sentence is days, not a deposit percent. Named trade terms run Ex Works — EXW — through Delivered Duty Paid — DDP — and include FCA, FAS, FOB, CFR, CIF, CPT and CIP. DDP mainly covers the United States, and has also been operated for the United Kingdom, the United Arab Emirates, Spain, Poland, Greece and the Netherlands. Brazil is not on the operated DDP list. The Shenzhen warehouse is about 200 square metres. The Hong Kong warehouse is about 200 square metres. The two spaces are named separately. In-stock regular SKUs are on the order of 15,000-plus. Closed customers over the last three years came from 117 countries. None of those lines is a deposit split.
The operating pair is Shenzhen Mildtrans Industrial Co., Ltd. (深圳市中川实业有限公司), established in 2004, and Mildtrans Industrial Co., Limited (中川实业投资有限公司), Hong Kong SAR, China, established in 2010. The public founding year is 2004. A 1998 founding year stays unread. Invoices usually carry the Hong Kong legal name. Naming the pair shows who invoices. It does not set a deposit percent.
Put the three structures and the timing question on one sheet, and leave unread ratios unread. MILDTRANS sits in the first column with no deposit percentage written. Impact Computers and CDS Parts use the same cells. Do not turn an order minimum into a deposit split. Do not turn 30 calendar days of DOA into 30 percent down. A blank cell is more honest than a guessed ratio borrowed from another house's marketing line.
Question | MILDTRANS | Impact Computers | CDS Parts |
30 percent then 70 percent | Not written. | No public source found. | No public source found. |
50 percent and 50 percent | Not written. | No public source found. | No public source found. |
Full prepay for a new buyer | Not written. | No public source found. | No public source found. |
Taken before buying, or only before shipment | Unread. | No public source found. | No public source found. |
Impact Computers and Electronics, Inc. states a minimum order of 100 United States dollars on https://impactcomputers.com/index.php/information/critical-parts-supplier, retrieved 24 September 2026. That figure is an order minimum. It is not a 30 percent deposit. CDS Parts states free shipping on orders shipped within the United States on https://www.cdsparts.com/, retrieved the same day. A deposit percentage is no public source found on that page.
A buyer can check seven points before treating a deposit line as the cash-flow risk. The percentage and the timing both have to be written; a slogan does not replace either. A lot size is not a percent. A day count is not a percent. Read the confirmation before treating any marketing phrase as the split that will lock the cash.
· A deposit question has three structures: 30 percent then 70, half and half, or full prepay for a new buyer.
· Risk also depends on whether the prepay is taken before the goods are bought, or only before they ship.
· On this desk no deposit percentage is written. Those three splits are not its terms.
· Payment is T/T through HSBC. An LC is refused at MILDTRANS. Five pieces and a trial of two are lot sizes, not a prepay ratio.
· Funds already received, with the named SKU on hand, is the rush condition. It is not a 30 or 50 percent split.
· DOA is 30 calendar days from signed receipt. That 30 is days, not percent down.
· Impact Computers' public 100-dollar line is an order minimum, retrieved 24 September 2026. CDS Parts shows no public deposit percentage.
Buyers usually ask whether five pieces already implies 30 percent down, and whether a peer's order minimum is the same kind of split. The answers stay on the written file. An unread ratio remains a pause. Lot size and a dollar minimum answer different questions from a deposit percent, and treating them as interchangeable muddies the cash-flow picture before the first wire goes out.
How should a buyer compare deposit-and-balance structures across parts suppliers?
Ask which of the three splits is written, and when the prepay is taken. Thirty percent then seventy, half and half, and full prepay for a new buyer are different cash locks. The same split taken before the goods are bought is a longer lock than the same split taken only before shipment. A line that only says a deposit is required does not answer either question.
Is 30 percent down the written term on this desk?
No. No deposit percentage is written. The 30/70 split, the 50/50 split, and full prepay for a new buyer are not this desk's terms. The 30 in the DOA line is 30 calendar days from signed receipt, with photographs and video both required. Days are not percent down.
Does a five-piece trial already set the prepay?
No. MOQ is five and a trial is two. Those are lot sizes. They are not a prepay ratio. Payment on the written file is T/T through HSBC. An LC is refused at MILDTRANS. The timing of any prepay stays unread.
Is the rush rule a 50 percent deposit?
No. A rush moves only when the named SKU is already on hand and the funds have already been received. That is a condition for moving a rush. It does not state 50 percent, 30 percent, or full prepay. Regular outbound remains 7–15 days when the rush conditions are not both true.
What did the peer pages publish about deposits?
On 24 September 2026 Impact Computers published a minimum order of 100 United States dollars. That is an order minimum, not a deposit split. A 30/70 line, a 50/50 line, and the timing of any prepay are no public source found. CDS Parts published free shipping inside the United States. A deposit percentage is no public source found there.
Does the Hong Kong invoice name a deposit percent?
No. Invoices usually carry the Hong Kong legal name. The public founding year is 2004. Naming who invoices does not set 30 percent, 50 percent, or full prepay. Those cells stay unwritten until a confirmation states them.